Vincent Hospital


Project Overview
Introduction:
SVUH Advanced Enabling Works – Block N Boiler House (Basement Services) for St. Vincent’s University Hospital, Dublin, Ireland.
Core Objective:
-
Complex hospital-grade MEP installation, requiring compliance with strict healthcare design standards.
-
Precise coordination of large-diameter pipework (up to 500mm) in confined basement zones.
-
Demonstrates Jones Engineering’s expertise in healthcare mechanical services, particularly in boiler house and basement plant integration.
LOD (Level of Development):
LOD 300 – Coordination & Installation Layouts
Location
Dublin, Ireland
Scope of Work
500mm Diameter Header Layout:
Shows large hot water headers (supply and return) at the basement boiler house.
Header Sections :
Detailed sectional views indicating flow and return lines, including 500mm and 300mm diameter piping routes.
Plant & Utility Rooms:
Locations of plant rooms, water tanks, store rooms, and pump rooms.
MEP Services:
Includes ducts above corridors, underfloor heating connections, fire & riser (F&R) mains, natural gas risers, oil supply & return lines, generator feeds, and dialysis loop piping.
Compliance & Standards
-
CIBSE Mechanical & Electrical Engineering Standards
-
Irish Building Regulations (TGD series)
-
BS EN 12056 (Gravity Drainage Systems)
-
BS 9999 (Fire Safety)
-
HTM (Health Technical Memoranda) for healthcare MEP compliance