top of page

MENU

Darwin Project

01 copy.jpg
000 copy.jpg

Project Overview

Introduction:

Project Darwin is a comprehensive Mechanical, Electrical, and Plumbing (MEP) design package for a modern warehouse and adjoining office floors. Our scope covers end‑to‑end building services - Firefighting, HVAC, Electrical, and Plumbing. The deliverables include discipline‑wise drawings as well as combined‑services layouts to ensure clean coordination, safe operation, and ease of maintenance.

Core Objective:

  • Deliver a coordinated, clash-free MEP design for warehouse and office spaces.

  • Ensure safety, comfort, and energy efficiency through system selection and code compliance.

  • Optimize routing, sizing, and equipment selection for ease of operation and maintenance.

  • Integrate fire/life safety, ventilation, power distribution, and plumbing seamlessly across facilities.

Location

United Kingdom

Scope of Work

Firefighting: Hydrant, sprinklers, pumps, alarms, and emergency lighting.
HVAC: Heat load, AHU design, ventilation, optimized routing, energy efficiency.
Electrical: Load estimation, lighting, power distribution, grounding, backup systems.
Plumbing: Water supply, drainage, rainwater harvesting, hot-water systems.
Combined Layouts: Integrated multi-discipline coordination for clash-free design.

Compliance & Standards

Firefighting: Designed to UK Building Regulations (Part B) with BS 9999, BS 9990, BS 5839, and BS EN 12845 for fire safety, alarms, hydrants, and sprinklers.

HVAC: Complies with Part F & Part L, CIBSE Guides A/B, and BS EN 13779, ensuring efficient ventilation and energy performance.

Electrical: Installed per BS 7671 (IET Wiring Regs), Part P, with BS 5266 for emergency lighting and BS EN 62305 for lightning protection.

Plumbing: Follows Part G, BS EN 806 & 12056, BS 8558, and Water Supply Regulations 1999 for safe water and drainage systems.

bottom of page