top of page

MENU

Concrete Bridge - Italy

1.jpg
rr1.jpg

Project Overview

Project Title:
PNRR Strade Sicure: BIM & Monitoring for Concrete Viaduct 010010010470

Overview:
Advanced BIM modeling and structural monitoring design for a critical concrete viaduct, delivered under Italy’s PNRR "Strade sicure" initiative (Contract DG 62/22 LOTTO 1).

Contractor:

RTI Partnership

TECNO ART SRL (BIM & Survey)

FRANCHETTI S.P.A. (Engineering)

Location

Italy

Key Highlights

BIM Integration:
LOD 300+ model (UNI 11337-compliant) with defect mapping, sensor nodes, and digital-twin capabilities.

Concrete Focus:
Corrosion/deformation tracking for predictive maintenance.

Technical Output:
Planimetric survey drawing [010010010470T01VIC02RILPL01A] with area calculations and schematics.

Scope:
Part of resilience upgrades for 49 northern Italian infrastructures.

Standards

BIM: UNI 11337
Concrete: Eurocode 2, NTC 2018

Monitoring: ANAS 2021

bottom of page