Concrete Bridge - Italy


Project Overview
Project Title:
PNRR Strade Sicure: BIM & Monitoring for Concrete Viaduct 010010010470
Overview:
Advanced BIM modeling and structural monitoring design for a critical concrete viaduct, delivered under Italy’s PNRR "Strade sicure" initiative (Contract DG 62/22 LOTTO 1).
Contractor:
RTI Partnership
TECNO ART SRL (BIM & Survey)
FRANCHETTI S.P.A. (Engineering)
Location
Italy

Key Highlights
BIM Integration:
LOD 300+ model (UNI 11337-compliant) with defect mapping, sensor nodes, and digital-twin capabilities.
Concrete Focus:
Corrosion/deformation tracking for predictive maintenance.
Technical Output:
Planimetric survey drawing [010010010470T01VIC02RILPL01A] with area calculations and schematics.
Scope:
Part of resilience upgrades for 49 northern Italian infrastructures.
Standards
BIM: UNI 11337
Concrete: Eurocode 2, NTC 2018
Monitoring: ANAS 2021



